Koukoutamba
Download PDF data sheet
Particulars
Owner: unknown
Designer: unknown
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: unknown
Height: 86 metres
Length: unknown
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: 07/17 (July 2017)
Start of RCC: —/22 (— 2022)
End of RCC: —/24 (— 2024)
End of Project: —/25 (— 2025)
Country: Guinea
River: Bafing
DMS Co-ordinates: 11˚16'16.82"N, 11˚22'55.91"W
DD Co-ordinates: 11.271338, -11.382197
Facings
Upstream
Slope | Type |
---|---|
Vertical |
Downstream
Slope | Type |
---|---|
0.70 | |
0.80 |
Spillway
Slope | Type |
---|---|
0.72 |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|