Koysha (Gibe IV)
Download PDF data sheet
Particulars
Owner: unknown
Designer: WeBuild-WB (Salini - Impregilo SpA)
Contractor: WeBuild-WB (Salini - Impregilo SpA)
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 14700 m3x106
Height: 168 metres
Length: 1000 metres
Volume of RCC: 7400 m3x103
Total volume: 7400 m3x103
Construction Dates
Start of Project: 09/13 (September 2013)
Start of RCC: 06/20 (June 2020)
End of RCC: —/23 (— 2023)
End of Project: —/24 (— 2024)
Country: Ethiopia
River: Omo
DMS Co-ordinates: 6˚34'40.88"N, 36˚32'59.04"E
DD Co-ordinates: 6.578022, 36.549732
Facings
Upstream
Slope | Type |
---|---|
0.10 | RCC against formwork (GEVR/GE-RCC) |
0.35 |
Downstream
Slope | Type |
---|---|
0.70 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
separate |
Placement
Layers (mm) | Lifts (mm) |
---|---|
400 | 400 |
Cementitious material
Cement (kg/m3) |
---|
57 to |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
23 to | Natural pozzolan (ASTM Class N) |