Lavrinha
Download PDF data sheet
Particulars
Owner: unknown
Designer: unknown
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: unknown
Height: 28 metres
Length: unknown
Volume of RCC: 85 m3x103
Total volume: unknown
Construction Dates
Start of Project: 12/07 (December 2007)
Start of RCC: —/09 (— 2009)
End of RCC: —/10 (— 2010)
End of Project: —/11 (— 2011)
Country: Brazil
River: Paraiba do Sul
DMS Co-ordinates: 22˚34'4.59"S, 44˚51'50.19"W
DD Co-ordinates: -22.567942, -44.863941
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|