Liangsanping
Download PDF data sheet
Particulars
Owner: unknown
Designer: Sixian Water Resources Bureau, Bangzhou City, Hunan Province
Contractor: Lianguanping Headquarter of Reservoir Project
Statistics
Type: Thin Arch
Purpose(s): Hydropower
Reservoir capacity: 4 m3x106
Height: 35 metres
Length: 33 metres
Volume of RCC: 3 m3x103
Total volume: 3 m3x103
Construction Dates
Start of Project: —/79 (— 1979)
Start of RCC: —/80 (— 1980)
End of RCC: —/81 (— 1981)
End of Project: —/82 (— 1982)
Country: China
River: Leishui
DMS Co-ordinates: 25˚42'23.55"N, 113˚07'57.39"E
DD Co-ordinates: 25.706541, 113.132607