Liubo
Download PDF data sheet
Photo coming soon

Particulars
Owner: unknown
Designer: Anhui Investigation & Design Institute
Contractor: 10th Construction Bureau
Statistics
Type: Thin Arch
Purpose(s): Flood Control / Hydropower
Reservoir capacity: 51 m3x106
Height: 70 metres
Length: 258 metres
Volume of RCC: 130 m3x103
Total volume: 168 m3x103
Construction Dates
Start of Project: —/02 (— 2002)
Start of RCC: —/03 (— 2003)
End of RCC: —/03 (— 2003)
End of Project: —/04 (— 2004)
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |
