Longshou Nº1
Download PDF data sheet
Particulars
Owner: unknown
Designer: Guijang Institute of Investigation and Design of Water Conservancy and Hydropower in Gansu Province
Contractor: 4th Construction Bureau
Statistics
Type: Arch-Gravity
Purpose(s): Hydropower
Reservoir capacity: 13 m3x106
Height: 80 metres
Length: 258 metres
Volume of RCC: 187 m3x103
Total volume: 210 m3x103
Construction Dates
Start of Project: 04/99 (April 1999)
Start of RCC: 03/00 (March 2000)
End of RCC: 06/01 (June 2001)
End of Project: 09/01 (September 2001)
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.20 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
96 |
58 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
109 | Low-lime flyash (ASTM Class F) |
113 |