Los Morales
Download PDF data sheet
Particulars
Owner: unknown
Designer: O.C.I.S.A.
Contractor: OCISA (Obras y Construcciones Industriales S.A.) - now ACS Dragados
Statistics
Type: Gravity
Purpose(s): Water Supply
Reservoir capacity: 2 m3x106
Height: 28 metres
Length: 200 metres
Volume of RCC: 22 m3x103
Total volume: 26 m3x103
Construction Dates
Start of Project: 06/86 (June 1986)
Start of RCC: 02/87 (February 1987)
End of RCC: 10/87 (October 1987)
End of Project: 12/87 (December 1987)
Country: Spain
River: Morales
DMS Co-ordinates: 40˚18'53.38"N, 4˚31'10.71"W
DD Co-ordinates: 40.314827, -4.519642
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
RCC against formwork |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 - | 300 - |
400 | 400 |
Cementitious material
Cement (kg/m3) |
---|
80 |
74 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
140 | Low-lime flyash (ASTM Class F) |
128 |