Lower Chatkal
Download PDF data sheet
Lower Chatkal under construction

Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 5 m3x106
Height: 60 metres
Length: 270 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/23 (— 2023)
Start of RCC: —/25 (— 2025)
End of RCC: —/26 (— 2026)
End of Project: —/27 (— 2027)
Country: Uzbekistan
River: Chatkal
DMS Co-ordinates: 41˚32'46.47"N, 70˚7'50.6"E
DD Co-ordinates: 41.546242, 70.130722
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
