Ludila
Download PDF data sheet
Particulars
Owner: unknown
Designer: unknown
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 1718 m3x106
Height: 140 metres
Length: 622 metres
Volume of RCC: unknown
Total volume: 1920 m3x103
Construction Dates
Start of Project: 01/07 (January 2007)
Start of RCC: —/11 (— 2011)
End of RCC: —/14 (— 2014)
End of Project: —/15 (— 2015)
Country: China
River: Jingsha
DMS Co-ordinates: 26˚12'04.18"N, 100˚48'58.37"E
DD Co-ordinates: 26.20116, 100.816216
Facings
Upstream
Slope | Type |
---|---|
Vertical | |
0.20 |
Downstream
Slope | Type |
---|---|
0.75 |
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|