Maiwan
Download PDF data sheet
Particulars
Owner: unknown
Designer: unknown
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower / Irrigation
Reservoir capacity: 615 m3x106
Height: 79 metres
Length: 377 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: 04/20 (April 2020)
Start of RCC: 03/22 (March 2022)
End of RCC: 05/24 (May 2024)
End of Project: —/25 (— 2025)