Manduriacu
Download PDF data sheet
Particulars
Owner: unknown
Designer: Typsa, Spain
Contractor: Odebretch
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 10 m3x106
Height: 61 metres
Length: 245 metres
Volume of RCC: 114 m3x103
Total volume: unknown
Construction Dates
Start of Project: 12/11 (December 2011)
Start of RCC: —/13 (— 2013)
End of RCC: —/14 (— 2014)
End of Project: 03/15 (March 2015)
Country: Ecuador
River: Mauduriacu
DMS Co-ordinates: 0˚12'50.61"N, 78˚54'44.97"W
DD Co-ordinates: 0.214058, -78.912491
Facings
Upstream
Slope | Type |
---|---|
0.25 |
Downstream
Slope | Type |
---|---|
0.75 |
Spillway
Slope | Type |
---|---|
0.75 |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Natural pozzolan (ASTM Class N) | |