Maoeryan
Download PDF data sheet
Particulars
Owner: unknown
Designer: unknown
Contractor: unknown
Statistics
Type: Thin Arch
Purpose(s): unknown
Reservoir capacity: 33 m3x106
Height: 35 metres
Length: unknown
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/68 (— 1968)
Start of RCC: —/88 (— 1988)
End of RCC: —/91 (— 1991)
End of Project: —/93 (— 1993)
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|