Mashkid 2

Download PDF data sheet
Mashkid 2 under construction
Mashkid 2 under construction

Particulars

Owner: unknown

Designer: Absaran

Contractor: Ev Yol/Flar Joint Venture

Statistics

Type: Gravity

Purpose(s): Flood Control / Irrigation / Water Supply

Reservoir capacity: 115 m3x106

Height: 36 metres

Length: 1450 metres

Volume of RCC: 650 m3x103

Total volume: 850 m3x103

Construction Dates

Start of Project: 10/17 (October 2017)

Start of RCC: 04/22 (April 2022)

End of RCC: /24 ( 2024)

End of Project: /25 ( 2025)

Country: Iran

River: Simish & Mashkid

DMS Co-ordinates: 27˚04'30"N, 62˚46'6"E

DD Co-ordinates: 27.075001, 62.768333