Monti Nieddu (Sa Stria)
Download PDF data sheet
Particulars
Owner: unknown
Designer: Prof. Ing. Costantino A. Fassó
Contractor: Astaldi
Statistics
Type: Gravity
Purpose(s): Irrigation / Water Supply
Reservoir capacity: 35 m3x106
Height: 88 metres
Length: 360 metres
Volume of RCC: 333 m3x103
Total volume: 449 m3x103
Construction Dates
Start of Project: 01/98 (January 1998)
Start of RCC: 01/18 (January 2018)
End of RCC: —/24 (— 2024)
End of Project: —/25 (— 2025)
Country: Italy
River: Monti Nieddu
DMS Co-ordinates: 39˚3'59.45"N, 8˚57'46.88"E
DD Co-ordinates: 39.066513, 8.963022
Facings
Upstream
Slope | Type |
---|---|
0.05 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
90 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
55 | Low-lime flyash (ASTM Class F) |