Moula
Download PDF data sheet
Photo coming soon

Statistics
Type: Hardfill
Purpose(s): Water Supply
Reservoir capacity: 26 m3x106
Height: 81 metres
Length: 324 metres
Volume of RCC: 422 m3x103
Total volume: 450 m3x103
Construction Dates
Start of Project: 02/03 (February 2003)
Start of RCC: —/08 (— 2008)
End of RCC: —/10 (— 2010)
End of Project: 11/11 (November 2011)
Country: Tunisia
River: Bou Terfess
DMS Co-ordinates: 36˚52'56.09"N, 8˚41'56.19"E
DD Co-ordinates: 36.882248, 8.698942
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 120 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |
