Nam Mang 3
Download PDF data sheet
Particulars
Owner: unknown
Designer: unknown
Contractor: China International Water and Electric Corporation
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 49 m3x106
Height: 28 metres
Length: 151 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/02 (— 2002)
Start of RCC: —/03 (— 2003)
End of RCC: —/04 (— 2004)
End of Project: 01/05 (January 2005)
Country: Laos
River: Nam Gnong
DMS Co-ordinates: 18˚21'17.67"N, 102˚48'12.82"E
DD Co-ordinates: 18.354908, 102.803558
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|