SEARCHING
... please wait

Nam Ngiep I

Download PDF data sheet
Nam Ngiep I completed
Nam Ngiep I completed

Particulars

Owner: unknown

Designer: Kansai

Contractor: Obayashi (with sub-Contractor Song Da Corporation)

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 1192 m3x106

Height: 167 metres

Length: 540 metres

Volume of RCC: 2288 m3x103

Total volume: unknown

Construction Dates

Start of Project: 09/14 (September 2014)

Start of RCC: 04/16 (April 2016)

End of RCC: 04/18 (April 2018)

End of Project: 08/19 (August 2019)

Country: Laos

River: Nam Ngiep

DMS Co-ordinates: 18˚38'44.08"N, 103˚31'31.63"E

DD Co-ordinates: 18.646389, 103.525452

Facings

Upstream

SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)

Downstream

SlopeType
 RCC against formwork (GEVR/GE-RCC)  [stepped face]

Spillway

SlopeType
 Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3002400  -
 3600

Cementitious material

Cement (kg/m3)
80
60
Pozzolan (kg/m3)Pozzolan Type
120Low-lime flyash (ASTM Class F)
70