Nickajack Auxillary Spillway
Download PDF data sheet
Particulars
Owner: unknown
Designer: Vann A. Newell & Harry A. Mason
Contractor: TVA Construction Forces, GUMBK, Sequatchie Concrete Services Inc.
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 311 m3x106
Height: 17 metres
Length: 427 metres
Volume of RCC: 79 m3x103
Total volume: 79 m3x103
Construction Dates
Start of Project: 08/89 (August 1989)
Start of RCC: 07/90 (July 1990)
End of RCC: 02/91 (February 1991)
End of Project: 04/92 (April 1992)
Country: USA
River: Tennessee
DMS Co-ordinates: 35˚0'13.13"N, 85˚37'10.88"W
DD Co-ordinates: 35.003647, -85.61969
Facings
Upstream
Slope | Type |
---|---|
0.25 | RCC against formwork [stepped face] |
Downstream
Slope | Type |
---|---|
0.60 | RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.60 | RCC against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 600 |
Cementitious material
Cement (kg/m3) |
---|
85 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
119 | Low-lime flyash (ASTM Class F) |