Pedrógão
Download PDF data sheet
Particulars
Owner: unknown
Designer: EDP Produgão - EM
Contractor: Engil, Mota J.V.
Statistics
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation
Reservoir capacity: 106 m3x106
Height: 43 metres
Length: 448 metres
Volume of RCC: 172 m3x103
Total volume: 392 m3x103
Construction Dates
Start of Project: 08/02 (August 2002)
Start of RCC: 02/04 (February 2004)
End of RCC: 08/04 (August 2004)
End of Project: —/05 (— 2005)
Country: Portugal
River: Guadiana
DMS Co-ordinates: 39˚6'38.98"N, 7˚37'48.47"W
DD Co-ordinates: 39.110828, -7.630131
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
55 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
165 | Low-lime flyash (ASTM Class F) |