Pinalito
Download PDF data sheet
Particulars
Owner: unknown
Designer: PCE, Rio de Janeiro, Brazil
Contractor: Constructora Norberto Odebrecht, Brazil
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 4 m3x106
Height: 52 metres
Length: 210 metres
Volume of RCC: 73 m3x103
Total volume: 100 m3x103
Construction Dates
Start of Project: 09/04 (September 2004)
Start of RCC: 11/05 (November 2005)
End of RCC: 03/07 (March 2007)
End of Project: —/08 (— 2008)
Country: Dominican Republic
River: Tireo
DMS Co-ordinates: 18˚54'59.05"N, 70˚37'32.53"W
DD Co-ordinates: 18.916403, -70.625702
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
98 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
8 | Natural pozzolan (ASTM Class N) |