Download PDF data sheet
Pingban completed
Pingban completed

Particulars

Owner: unknown

Designer: Guangxi Investigation and Design Institute of Hydropower

Contractor: Guangxi Construction Bureau

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 278 m3x106

Height: 62 metres

Length: 396 metres

Volume of RCC: 150 m3x103

Total volume: 700 m3x103

Construction Dates

Start of Project: 12/01 (December 2001)

Start of RCC: /02 ( 2002)

End of RCC: /04 ( 2004)

End of Project: 07/05 (July 2005)

Country: China

River: Nanpan

DMS Co-ordinates: unknown

DD Co-ordinates: ,

Facings

Upstream

SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)

Downstream

SlopeType
0.70RCC against formwork (GEVR/GE-RCC)

Spillway

SlopeType
ogeeReinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)