Qingyanggou
Download PDF data sheet
Particulars
Owner: unknown
Designer: unknown
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: unknown
Height: 64 metres
Length: 147 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/09 (— 2009)
Start of RCC: —/10 (— 2010)
End of RCC: —/11 (— 2011)
End of Project: —/12 (— 2012)
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|