Retiro
Download PDF data sheet
Particulars
Owner: unknown
Designer: Duke Energy, Union, Hochtief and SBB
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): unknown
Reservoir capacity: 18 m3x106
Height: 15 metres
Length: 482 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/10 (— 2010)
Start of RCC: —/11 (— 2011)
End of RCC: —/12 (— 2012)
End of Project: 07/13 (July 2013)
Country: Brazil
River: Sapucai
DMS Co-ordinates: 20˚26'12.67"S, 47˚53'18.54"W
DD Co-ordinates: -20.436853, -47.888481
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|