SEARCHING
... please wait

Rio do Peixe

Download PDF data sheet
Photo coming soon

Particulars

Owner: CPFL Energias Renovavies S.A.

Designer: unknown

Contractor: unknown

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: unknown

Height: 32 metres

Length: 300 metres

Volume of RCC: unknown

Total volume: unknown

Construction Dates

Start of Project: /18 ( 2018)

Start of RCC: /20 ( 2020)

End of RCC: /21 ( 2021)

End of Project: 07/22 (July 2022)

Country: Brazil

River: do Peixe

DMS Co-ordinates: 21˚37'39.05"S, 46˚47'24.75"W

DD Co-ordinates: -21.627514, -46.790207

Facings

Upstream

SlopeType
  

Downstream

SlopeType
  

Spillway

SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type