Rio do Peixe
Download PDF data sheet
Photo coming soon

Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: unknown
Height: 32 metres
Length: 300 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/18 (— 2018)
Start of RCC: —/20 (— 2020)
End of RCC: —/21 (— 2021)
End of Project: 07/22 (July 2022)
Country: Brazil
River: do Peixe
DMS Co-ordinates: 21˚37'39.05"S, 46˚47'24.75"W
DD Co-ordinates: -21.627514, -46.790207
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|