SEARCHING
... please wait

R’Mel (formerly Tanger-Med)

Download PDF data sheet
R’Mel (formerly Tanger-Med) completed
R’Mel (formerly Tanger-Med) completed

Particulars

Owner: unknown

Designer: NOVEC (Ingema)

Contractor: SGTM

Statistics

Type: Gravity

Purpose(s): Flood Control / Water Supply

Reservoir capacity: 25 m3x106

Height: 79 metres

Length: 250 metres

Volume of RCC: 230 m3x103

Total volume: 243 m3x103

Construction Dates

Start of Project: 05/05 (May 2005)

Start of RCC: 06/06 (June 2006)

End of RCC: 06/07 (June 2007)

End of Project: 10/07 (October 2007)

Country: Morocco

River: R’Mel

DMS Co-ordinates: 35˚52'32.55"N, 5˚29'4.7"W

DD Co-ordinates: 35.87571, -5.484639

Facings

Upstream

SlopeType
VerticalReinforced conventional concrete cast before RCC placement

Downstream

SlopeType
0.75Traditional concrete against formwork

Spillway

SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
100
90
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
0