SEARCHING
... please wait

Rongdi

Download PDF data sheet
Photo coming soon

Particulars

Owner: unknown

Designer: Guangxi Water Conservancy & Hydropower Investigation and Design Institute

Contractor: Gezhouba Construction Bureau

Statistics

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation

Reservoir capacity: 19 m3x106

Height: 53 metres

Length: 136 metres

Volume of RCC: 61 m3x103

Total volume: 108 m3x103

Construction Dates

Start of Project: 04/88 (April 1988)

Start of RCC: 11/88 (November 1988)

End of RCC: 07/89 (July 1989)

End of Project: 06/91 (June 1991)

Country: China

River: Dulanghe

DMS Co-ordinates: unknown

DD Co-ordinates: ,

Facings

Upstream

SlopeType
VerticalRCC against precast concrete panels

Downstream

SlopeType
0.75RCC against precast concrete blocks

Spillway

SlopeType
0.65Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
69
Pozzolan (kg/m3)Pozzolan Type
140Low-lime flyash (ASTM Class F)
111