Saddle Dam D (Xe-Pian Xe-Namnoy)
Download PDF data sheet
Saddle Dam D (Xe-Pian Xe-Namnoy) on Google Earth

Particulars
Owner: unknown
Designer: Mott Macdonald
Contractor: SK Engineering and Construction (SK E&C)
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 1043 m3x106
Height: 56 metres
Length: 430 metres
Volume of RCC: 170 m3x103
Total volume: 200 m3x103
Construction Dates
Start of Project: 10/18 (October 2018)
Start of RCC: 04/19 (April 2019)
End of RCC: 10/19 (October 2019)
End of Project: —/19 (— 2019)
Country: Laos
River: Xepian
DMS Co-ordinates: 15˚0'58.36"N, 106˚33'57.06"E
DD Co-ordinates: 15.016211, 106.565849
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| [stepped face] |
Spillway
| Slope | Type |
|---|---|
| none |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |
