San Bartolo
Download PDF data sheet
Particulars
Owner: unknown
Designer: Technoproject, S.A. de C.V.
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 39 m3x106
Height: 41 metres
Length: 371 metres
Volume of RCC: 77 m3x103
Total volume: unknown
Construction Dates
Start of Project: —/13 (— 2013)
Start of RCC: —/14 (— 2014)
End of RCC: —/15 (— 2015)
End of Project: —/16 (— 2016)
Country: Panama
River: San Pablo
DMS Co-ordinates: 8˚19'22.93"N, 81˚16'11.1"W
DD Co-ordinates: 8.323217, -81.270042
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.85 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.85 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
90 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
0 | No pozzolan used - |