Santa Eugenia
Download PDF data sheet
Particulars
Owner: unknown
Designer: Oficina Tecnica AEPO (Eng. Vicente Perez Vilar)
Contractor: Cubiertas y Mzov S.A.
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 17 m3x106
Height: 84 metres
Length: 290 metres
Volume of RCC: 225 m3x103
Total volume: 254 m3x103
Construction Dates
Start of Project: 01/87 (January 1987)
Start of RCC: 06/87 (June 1987)
End of RCC: 06/88 (June 1988)
End of Project: 10/88 (October 1988)
Country: Spain
River: Xallas
DMS Co-ordinates: 42˚54'53.18"N, 9˚6'14.98"W
DD Co-ordinates: 42.914772, -9.104161
Facings
Upstream
Slope | Type |
---|---|
0.05 | RCC against formwork |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork [stepped face] |
0.35 | RCC against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 250 |
Cementitious material
Cement (kg/m3) |
---|
88 |
72 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
152 | Low-lime flyash (ASTM Class F) |
145 |