Shaba
Download PDF data sheet
Shaba completed

Particulars
Owner: unknown
Designer: Guizhou Institute of Investigation, Design and research for Water Resources and Hydropower Projects
Contractor: Gezhouba Construction Bureau
Statistics
Type: Thin Arch
Purpose(s): Hydropower
Reservoir capacity: 99 m3x106
Height: 87 metres
Length: 148 metres
Volume of RCC: 67 m3x103
Total volume: 90 m3x103
Construction Dates
Start of Project: —/04 (— 2004)
Start of RCC: —/05 (— 2005)
End of RCC: —/06 (— 2006)
End of Project: —/07 (— 2007)
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
