SEARCHING
... please wait

Shah wa Arüs

Download PDF data sheet
Shah wa Arüs completed
Shah wa Arüs completed

Particulars

Owner: unknown

Designer: unknown

Contractor: Tablieh Parhoon Tarh JV

Statistics

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

Reservoir capacity: 10 m3x106

Height: 78 metres

Length: 303 metres

Volume of RCC: 270 m3x103

Total volume: 337 m3x103

Construction Dates

Start of Project: /12 ( 2012)

Start of RCC: /13 ( 2013)

End of RCC: /19 ( 2019)

End of Project: 04/21 (April 2021)

Country: Afghanistan

River: Shakardar

DMS Co-ordinates: 34˚41'15.62"N, 69˚1'2.92"E

DD Co-ordinates: 34.687969, 69.017479

Facings

Upstream

SlopeType
VerticalTraditional concrete against formwork
0.20 

Downstream

SlopeType
0.80Traditional concrete against formwork

Spillway

SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
105
Pozzolan (kg/m3)Pozzolan Type
45Natural pozzolan (ASTM Class N)