Shatuo
Download PDF data sheet
Shatuo completed

Particulars
Owner: unknown
Designer: Guiyang Hydropower Investigation and Design Institute
Contractor: SinoHydro Construction Bureaux Nº7 &Nº8 Co. Ltd.
Statistics
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation
Reservoir capacity: 910 m3x106
Height: 101 metres
Length: 631 metres
Volume of RCC: 1510 m3x103
Total volume: 1980 m3x103
Construction Dates
Start of Project: 05/06 (May 2006)
Start of RCC: —/10 (— 2010)
End of RCC: —/12 (— 2012)
End of Project: —/13 (— 2013)
Country: China
River: Wu
DMS Co-ordinates: 28˚29'43.34"N, 108˚28'17.41"E
DD Co-ordinates: 28.495373, 108.471504
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.15 |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|