SEARCHING
... please wait

Shatuo

Download PDF data sheet
Shatuo completed
Shatuo completed

Particulars

Owner: unknown

Designer: Guiyang Hydropower Investigation and Design Institute

Contractor: SinoHydro Construction Bureaux Nº7 &Nº8 Co. Ltd.

Statistics

Type: Gravity

Purpose(s): Flood Control / Hydropower / Navigation

Reservoir capacity: 910 m3x106

Height: 101 metres

Length: 631 metres

Volume of RCC: 1510 m3x103

Total volume: 1980 m3x103

Construction Dates

Start of Project: 05/06 (May 2006)

Start of RCC: /10 ( 2010)

End of RCC: /12 ( 2012)

End of Project: /13 ( 2013)

Country: China

River: Wu

DMS Co-ordinates: 28˚29'43.34"N, 108˚28'17.41"E

DD Co-ordinates: 28.495373, 108.471504

Facings

Upstream

SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
0.15 

Downstream

SlopeType
0.75RCC against formwork (GEVR/GE-RCC)

Spillway

SlopeType
0.75RCC against formwork

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type