Shiyazi

Download PDF data sheet
Shiyazi completed
Shiyazi completed

Particulars

Owner: unknown

Designer: Hydrochina Guiyang Engineering Corporation

Contractor: SinoHydro Construction Bureau Nº9 Co. Ltd.

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 321 m3x106

Height: 135 metres

Length: unknown

Volume of RCC: unknown

Total volume: unknown

Construction Dates

Start of Project: /07 ( 2007)

Start of RCC: 04/08 (April 2008)

End of RCC: 12/11 (December 2011)

End of Project: 12/11 (December 2011)

Country: China

River: Hongjiadu

DMS Co-ordinates: unknown

DD Co-ordinates: ,