Shiyazi
Download PDF data sheet
Particulars
Owner: unknown
Designer: Hydrochina Guiyang Engineering Corporation
Contractor: SinoHydro Construction Bureau Nº9 Co. Ltd.
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 321 m3x106
Height: 135 metres
Length: unknown
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/07 (— 2007)
Start of RCC: 04/08 (April 2008)
End of RCC: 12/11 (December 2011)
End of Project: 12/11 (December 2011)
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|