Particulars

Owner: Chengde Shuangfengsi Project Bureau

Designer: Hebei Institute of Investigation and Design of Water Conservancy and Hydropower

Contractor: SinoHydro Construction Bureau Nº16 Co. Ltd.

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 137 m3x106

Height: 50 metres

Length: 535 metres

Volume of RCC: unknown

Total volume: 550 m3x103

Construction Dates

Start of Project: —/11 (— 2011)

Start of RCC: —/12 (— 2012)

End of RCC: —/13 (— 2013)

End of Project: —/14 (— 2014)