Shuangfengsi
Download PDF data sheet
Particulars
Owner: unknown
Designer: Hbei Prov.water Conservancy Bureau Design Institute
Contractor: SinoHydro Construction Bureau NÂș16 Co. Ltd.
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 137 m3x106
Height: 50 metres
Length: 535 metres
Volume of RCC: unknown
Total volume: 550 m3x103
Construction Dates
Start of Project: —/11 (— 2011)
Start of RCC: —/12 (— 2012)
End of RCC: —/13 (— 2013)
End of Project: —/14 (— 2014)