Shuikou
Download PDF data sheet
Particulars
Owner: unknown
Designer: East China Hydroelectric Power Investigation & Design Institute of MOE & MWR
Contractor: Fujian Huatian Construction J.V.
Statistics
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation
Reservoir capacity: 2613 m3x106
Height: 101 metres
Length: 791 metres
Volume of RCC: 600 m3x103
Total volume: 1710 m3x103
Construction Dates
Start of Project: 03/87 (March 1987)
Start of RCC: 10/90 (October 1990)
End of RCC: 05/92 (May 1992)
End of Project: 05/95 (May 1995)
Country: China
River: Min
DMS Co-ordinates: 26˚18'8.11"N, 118˚48'41.08"E
DD Co-ordinates: 26.302254, 118.811409
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.73 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
ogee | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
200 - | 200 - |
330 | 330 |
Cementitious material
Cement (kg/m3) |
---|
60 |
70 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
110 | Low-lime flyash (ASTM Class F) |
90 |