Silopi
Download PDF data sheet
Silopi on Google Earth

Particulars
Owner: unknown
Designer: ES Design Engineering Consultancy Limited Co.
Contractor: İlci Construction Industry and Trade Inc
Statistics
Type: Gravity
Purpose(s): Hydropower / Water Supply
Reservoir capacity: 29 m3x106
Height: 89 metres
Length: 356 metres
Volume of RCC: 718 m3x103
Total volume: 752 m3x103
Construction Dates
Start of Project: 08/08 (August 2008)
Start of RCC: —/10 (— 2010)
End of RCC: —/11 (— 2011)
End of Project: 02/12 (February 2012)
Country: Turkey
River: Hezil
DMS Co-ordinates: 37˚20'19.08"N, 42˚43'36.1"E
DD Co-ordinates: 37.338631, 42.726696
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 81 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | No pozzolan used - |
