São Bernardo
Download PDF data sheet
Particulars
Owner: unknown
Designer: unknown
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 2 m3x106
Height: 20 metres
Length: 120 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/03 (— 2003)
Start of RCC: —/04 (— 2004)
End of RCC: —/05 (— 2005)
End of Project: —/06 (— 2006)
Country: Brazil
River: unknown
DMS Co-ordinates: 27˚44'18.69"S, 51˚18'49.06"W
DD Co-ordinates: -27.738525, -51.313629
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|