Songyue Dam Raise
Download PDF data sheet
Photo coming soon

Particulars
Owner: unknown
Designer: Yanbian Investigation and Design Institute of Water Resources
Contractor: Helong Construction Bureau of Water Resources
Statistics
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Recreation / Water Supply
Reservoir capacity: unknown
Height: 41 metres
Length: 271 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/12 (— 2012)
Start of RCC: —/13 (— 2013)
End of RCC: —/14 (— 2014)
End of Project: —/15 (— 2015)
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.73 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| conduit |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 2000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Low-lime flyash (ASTM Class F) |