SEARCHING
... please wait

Sorkun

< Back to search results

Download PDF data sheet
Photo coming soon

Particulars

Owner: DSI - State Hydraulic Works

Designer: Su Yapi

Contractor: Egecan A.S.

Statistics

Type: Hardfill

Purpose(s): Irrigation

Reservoir capacity: 1 m3x106

Height: 24 metres

Length: 160 metres

Volume of RCC: 42 m3x103

Total volume: unknown

Construction Dates

Start of Project: 07/17 (July 2017)

Start of RCC: /20 ( 2020)

End of RCC: /22 ( 2022)

End of Project: /24 ( 2024)

Country: Turkey

River: Dokuzsele Creek

DMS Co-ordinates: 38˚42'28"N, 29˚24'09"E

DD Co-ordinates: 38.707779, 29.4025

Facings

Upstream

SlopeType
  

Downstream

SlopeType
  

Spillway

SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type