Söylemez
Download PDF data sheet
Photo coming soon

Particulars
Owner: DSI - State Hydraulic Works
Designer: unknown
Contractor: ICC Grup İns. A.Ş. & Brj İns San ve Tic A. Ş.Adi Ort.
Statistics
Type: Gravity
Purpose(s): Hydropower / Irrigation
Reservoir capacity: 1295 m3x106
Height: 113 metres
Length: 270 metres
Volume of RCC: 718 m3x103
Total volume: 750 m3x103
Construction Dates
Start of Project: 04/22 (April 2022)
Start of RCC: 04/24 (April 2024)
End of RCC: 11/27 (November 2027)
End of Project: 09/28 (September 2028)
Country: Turkey
River: Aras
DMS Co-ordinates: 39˚47'37"N, 41˚46'42"E
DD Co-ordinates: 39.79361, 41.778332
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|