Tamalout
Download PDF data sheet
Photo coming soon

Statistics
Type: Hardfill
Purpose(s): Flood Control / Irrigation / Water Supply
Reservoir capacity: 50 m3x106
Height: 61 metres
Length: 320 metres
Volume of RCC: 380 m3x103
Total volume: 405 m3x103
Construction Dates
Start of Project: 10/10 (October 2010)
Start of RCC: —/13 (— 2013)
End of RCC: —/17 (— 2017)
End of Project: —/18 (— 2018)
Country: Morocco
River: Ansegmir
DMS Co-ordinates: 32˚31'49.72"N, 5˚04'34.52"W
DD Co-ordinates: 32.530479, -5.076256
Facings
Upstream
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| 70 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |
| 0 |
