Tasköprü Çay
Download PDF data sheet
Particulars
Owner: unknown
Designer: unknown
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Irrigation / Water Supply
Reservoir capacity: 1 m3x106
Height: 52 metres
Length: 122 metres
Volume of RCC: 55 m3x103
Total volume: unknown
Construction Dates
Start of Project: 03/17 (March 2017)
Start of RCC: 07/18 (July 2018)
End of RCC: 09/19 (September 2019)
End of Project: 08/20 (August 2020)
Country: Turkey
River: Uludere
DMS Co-ordinates: 41˚32'39.28"N, 33˚54'43.32"E
DD Co-ordinates: 41.544243, 33.912033
Facings
Upstream
Slope | Type |
---|---|
0.10 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.80 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 |
Cementitious material
Cement (kg/m3) |
---|
75 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
50 | |