TB
Download PDF data sheet
Photo coming soon

Particulars
Owner: unknown
Designer: unknown
Contractor: Power China SinoHydro Construction Bureau Nº8 Co. Ltd.
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: unknown
Height: 158 metres
Length: unknown
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: 10/21 (October 2021)
Start of RCC: —/23 (— 2023)
End of RCC: —/26 (— 2026)
End of Project: —/27 (— 2027)
Country: China
River: Lancang (Mekong)
DMS Co-ordinates: 27˚8'37.2"N, 99˚9'50.91"E
DD Co-ordinates: 27.143667, 99.164139
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|