Tizidong
Download PDF data sheet
Particulars
Owner: unknown
Designer: Sichuan Institute of Investigation and Design of Water Resources
Contractor: 10th Construction Bureau
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 25 m3x106
Height: 56 metres
Length: 193 metres
Volume of RCC: 72 m3x103
Total volume: 161 m3x103
Construction Dates
Start of Project: 08/01 (August 2001)
Start of RCC: 10/02 (October 2002)
End of RCC: 10/03 (October 2003)
End of Project: 11/03 (November 2003)
Facings
Upstream
Slope | Type |
---|---|
Reinforced conventional concrete cast after RCC placement |
Downstream
Slope | Type |
---|---|
Reinforced conventional concrete cast after RCC placement |
Spillway
Slope | Type |
---|---|
Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Low-lime flyash (ASTM Class F) | |