Tongjiezi (with Niurixigou saddle dam)
Download PDF data sheet
Particulars
Owner: unknown
Designer: Chendu Hydroelectric Power Investigation & Design Institute, MOE & MWR
Contractor: 7th Construction Bureau, MOE & MWR
Statistics
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation
Reservoir capacity: 200 m3x106
Height: 88 metres
Length: 284 metres
Volume of RCC: 407 m3x103
Total volume: 855 m3x103
Construction Dates
Start of Project: 01/85 (January 1985)
Start of RCC: 10/88 (October 1988)
End of RCC: 12/89 (December 1989)
End of Project: 10/94 (October 1994)
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.75 | RCC against precast concrete blocks |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 - | 300 - |
500 | 500 |
Cementitious material
Cement (kg/m3) |
---|
79 |
82 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
79 | Low-lime flyash (ASTM Class F) |
83 |