Tongkou
Download PDF data sheet
Particulars
Owner: unknown
Designer: Institute of design and Investigation for Electricity in Mianyang
Contractor: Guangxi Construction Bureau
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 36 m3x106
Height: 72 metres
Length: 198 metres
Volume of RCC: 300 m3x103
Total volume: 352 m3x103
Construction Dates
Start of Project: 10/98 (October 1998)
Start of RCC: —/02 (— 2002)
End of RCC: —/04 (— 2004)
End of Project: —/04 (— 2004)
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
1.10 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
ogee | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Low-lime flyash (ASTM Class F) | |