SEARCHING
... please wait

Trung Son

Download PDF data sheet
Trung Son under construction
Trung Son under construction

Particulars

Owner: unknown

Designer: PECC4 (Power Engineering Consulting Company Nº4)

Contractor: Construction Company 47

Statistics

Type: Gravity

Purpose(s): Flood Control / Hydropower

Reservoir capacity: 349 m3x106

Height: 88 metres

Length: 498 metres

Volume of RCC: 770 m3x103

Total volume: 1140 m3x103

Construction Dates

Start of Project: 11/12 (November 2012)

Start of RCC: 04/14 (April 2014)

End of RCC: 08/16 (August 2016)

End of Project: 02/17 (February 2017)

Country: Vietnam

River: Ma

DMS Co-ordinates: 20˚36'36.73"N, 104˚50'14.95"E

DD Co-ordinates: 20.610203, 104.837486

Facings

Upstream

SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
0.35RCC against formwork (GEVR/GE-RCC)  [stepped face]

Downstream

SlopeType
0.65RCC against formwork (GEVR/GE-RCC)  [stepped face]

Spillway

SlopeType
0.65Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
60
70
Pozzolan (kg/m3)Pozzolan Type
140Natural pozzolan (ASTM Class N)
150