Tuy IV
Download PDF data sheet
Particulars
Owner: unknown
Designer: BISLA and Inclam S.A.
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Water Supply
Reservoir capacity: unknown
Height: 135 metres
Length: unknown
Volume of RCC: 1700 m3x103
Total volume: 1950 m3x103
Construction Dates
Start of Project: —/14 (— 2014)
Start of RCC: —/16 (— 2016)
End of RCC: —/18 (— 2018)
End of Project: —/19 (— 2019)
Country: Venezuela
River: Cuira
DMS Co-ordinates: 10˚12'47"S, 66˚14'31"W
DD Co-ordinates: -10.213056, -66.241943
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|